Chandigarh, 2nd May
2017:Chandigarh Housing Board, in pursuance to the decision taken
in its 397th meeting held on 30.06.2016 vide item no. 397.4.19, had
accorded permission to construct lifts to all CHB DUs, vide its order no. 178
dated 11.07.2016, subject to the following conditions:-
1) The design is to be got prepared by the
allottees of a block from a qualified architect registered with the Council of
Architects. The same alongwith
certificate of structural stability from a structural engineer registered with
the Chandigarh Administration shall be submitted to PAC (Upper) for approval by
the allottees at their own level.
Consent of all the allottees of a block shall be mandatory. For the
purpose of this a block is defined as all the DUs which are accessed by a
common staircase.
2) One copy of the plan, approved by PAC
(Upper), alongwith consent of all the allottees of the block shall be submitted
to CHB.
However,
many allottees have been approaching CHB for getting the condition of consent
removed. Considering the genuineness of
the demand and in the interest of pubic service, all the allottees are hereby
allowed to construct lifts without the need for any consent from other
allottees of the block, as per the design approved from PAC(Upper) after
submission through Chandigarh Housing Board/Private consultant, subject to the
condition that the entire cost of construction of lifts, cost of approval of
plans by PAC(Upper) will be borne by the
respective allottees without any contribution from the non-consenting
allottees. A standard fee of Rs.30.000/- (Rs. Thirty thousand only),
non-refundable, per block, payable in advance, shall be chargeable for
submission of plans to PAC(Upper) through CHB,
whether approved or not approved by them.